Infrastructure Sub-Projects-Chichawatni
Abstract of Sub-Projects Chichawatni
|
Name of Sub Project
|
: :
|
Rehabilitationm & Improvement of Road
|
|
T.M.A |
:
|
Chichawatni |
|
Length of Roads |
:
|
2.31 KM |
|
Approved Cost (Rs.) |
:
|
92.03 Million |
|
Implementation Period |
:
|
8 Months |
Existing
Situation:
The condition of roads in city
is not satisfactory due to serious disrepair.
Infrequent maintenance and improper roadside
drainage causes immense difficulties to pedestrians
and transporters during rainy season. The rainwater
finds no outlet and accumulates on these roads which
results in erosion and deterioration of these roads.
Moreover, the present situation is cause of traffic
hindrance and environmental pollution which is
ultimately affecting the health of the people.
Description of Sub Project:
The
sub project comprises of 4 roads namely Ahmad Nagar
Road, Girls College Road,Al-Fatah Road and College
Road. Storm water drains will be provided along all
the roads.
Sub Project Benefits:
The
completion of the project will result in the
following benefits:
• Good road surfaces will be available
to the public, which will improve the environment of
the town.
• The commercial activities and business
in the town will be improved as people feel ease in
reaching bazaars which are connected to these
streets.
• Public mental tension, frustration
will be minimized.
• The town will have a better look.