Infrastructure Sub-Projects -Chiniot

Abstract of Sub-Projects Chiniot

 

Name of Sub Project

 

:

:

 

Rehabilitation & Improvement of Roads

 

T.M.A

:

 

Chiniot

Length of Roads

:

5.21

KM

Approved Cost (Rs.)

:

 

19.72

Million

Implementation Period

:

 

10

Months


Existing Situation:

The condition of roads in city is not satisfactory due to serious disrepair. Infrequent maintenance and improper roadside drainage causes immense difficulties to pedestrians and transporters during rainy season. The rainwater finds no outlet and accumulates on these roads which results in erosion and deterioration of these roads.

Moreover, the present situation is cause of traffic hindrance and environmental pollution which is ultimately affecting the health of the people.

Description of Sub Project:

The sub project comprises asphalt pavement and brick pavement. Walk ways and storm water drains will be provided.

Sub Project Benefits:

The completion of the project will result in the following benefits:

•   Good road surfaces will be available to the public, which will improve the environment of the town.

•   The commercial activities and business in the town will be improved as people feel ease in reaching bazaars which are connected to these streets.

•   Public mental tension, frustration will be minimized.

•   The town will have a better look.