Infrastructure Sub-Projects -Chiniot
Abstract of Sub-Projects Chiniot
|
Name of Sub Project
|
: :
|
Rehabilitation & Improvement of Roads
|
|
T.M.A |
:
|
Chiniot |
|
Length of Roads |
: |
5.21 KM |
|
Approved Cost (Rs.) |
:
|
19.72 Million |
|
Implementation Period |
:
|
10 Months |
Existing
Situation:
The condition of roads in city is not satisfactory
due to serious disrepair. Infrequent maintenance and
improper roadside drainage causes immense
difficulties to pedestrians and transporters during
rainy season. The rainwater finds no outlet and
accumulates on these roads which results in erosion
and deterioration of these roads.
Moreover, the present situation is cause of traffic
hindrance and environmental pollution which is
ultimately affecting the health of the people.
Description of Sub Project:
The sub project comprises asphalt pavement and brick
pavement. Walk ways and storm water drains will be
provided.
Sub Project Benefits:
The completion of the project will result in the
following benefits:
• Good road surfaces will be available
to the public, which will improve the environment of
the town.
• The commercial activities and business
in the town will be improved as people feel ease in
reaching bazaars which are connected to these
streets.
• Public mental tension, frustration
will be minimized.
• The town will have a better look.
