Infrastructure Sub-Projects -Hassanabdal
Abstract of Sub-Projects Hasanabdal
|
Name of Sub Project
|
: :
|
Improvement of Solid Waste Management System
|
|
T.M.A |
:
|
Hasanabdal |
|
Approved Cost (Rs.) |
:
|
60.04 Million |
|
Implementation Period |
:
|
10 Months |
Existing
Situation:
The storage and collection system of solid wastes in
the city are either inadequate or inappropriate.
There are innumerable informal communal storage
locations in the city where the waste is temporarily
stored in form of open heaps on the street sides.
The city has no proper waste collection and disposal
system for municipal or other wastes, causing
contamination of soil. Excessive use of pesticides
has adversely affected biomass of agriculture land.
Description of Sub Project:
The system of solid waste management has been
designed to fill up the supply demand gap by the
provision of required machinery and equipment along
with development of sanitary landfill over 13-acres
of land. Upon completion of the project, the present
efficiency of 56% of solid waste management will be
raised to 92%; the entire city will have cleaner
look with improved environment.
The storage and collection of solid wastes is
planned to be split up in two stages, i.e., primary
and secondary. In the primary stage, storage will be
in the individual premises and the wastes collected
from there will be transferred to communal storage
units on the streets by means of hand carts or
manually.
In the secondary stage, communal storage units will
be served by motor vehicles and the wastes shifted
to the disposal site.
Sub Project Benefits:
The completion of the project will result in the
following benefits:
• Improvement in the environment of the
city.
• The commercial activities and business
in the city will be improved as people feel ease in
reaching streets.
• Public mental tension, frustration
will be minimized.
• The city will have a better look.
• Communicable diseases will be
decreased and odour problem will be minimized.