Infrastructure Sub-Projects-Mandi Bahauddin
Abstract of Sub-Projects Mandi Bahauddin
|
Name of Sub Project
|
: :
|
Rehabilitationm & Improvement of Road
|
|
T.M.A |
:
|
Mandi Bahauddin |
|
Length of Roads |
:
|
7.92 KM |
|
Approved Cost (Rs.) |
:
|
112.09 Million |
|
Implementation Period |
:
|
9 Months |
Existing
Situation:
The condition of roads in the city is not
satisfactory due to serious disrepair. Infrequent
maintenance and improper roadside drainage causes
immense difficulties to pedestrians and transporters
during rainy season. The rainwater finds no outlet
and accumulates on these roads which results in
erosion and deterioration of these roads.
Moreover, the present situation is cause of traffic
hindrance and environmental pollution which is
ultimately affecting the health of the people.
Description of Sub Project:
The sub project comprises of 5 roads namely Shafqat
Abad Road, Manzoor Abad Road, Wasoo Road, Wapda
Colony Road, Slaugther House Road.Storm drains are
provided along the roads.
Sub Project Benefits:
The completion of the project will result in the
following benefits:
• Good road surfaces will be available
to the public, which will improve the environment of
the town.
• The commercial activities and business
in the town will be improved as people feel ease in
reaching bazaars which are connected to these
streets.
• Public mental tension, frustration
will be minimized.
• The town will have a better look.
